Delivery times for completed jobs

For digital measurements, the time counts from the receipt of the file, but for analog measurements, the day of delivery and collection is not taken into account as business days.

FIXED SECTION DIGITAL FLOW ANALOG FLOW
Ceramic metal finished
4 to 5 days
5 days
Monolithic zirconia (with or without ceramic)
3 to 5 days
4 to 5 days
E-max disilicate (with or without ceramic)
4 to 5 days
5 days
metal test
4 to 5 days
5 days
PMMAs (trial or provisional)
2 to 4 days
3 to 4 days
Implant work
Zirconium crowns and bridges with interfaces
3 to 5 days
4 to 5 days
Metal on sintero-machined implant
5 to 7 days
6 to 7 days
Complex jobs
Consult protocols or contact the laboratory
REMOVABLE SECTION DIGITAL FLOW ANALOG FLOW
Impeller and passivity test
2 days
3 days
teeth test
3 to 5 days
4 to 5 days
Teeth test with skeletal
8 days
9 days
Bar + envelope + teeth test
9 to 10 days
10 days
Finished
3 days
3 to 4 days
SPLINTS
Michigan
2 days
3 days
surgical guide
2 days
Essix
days
2 days

Contact us

Contact